EN

Translate:

Memorial Day Sale on Quartz Countertops $49 Installed

Step by Step Process & granite countertops cost

Selecting Material ( Step-1)

bathroom counter store

We have over 500 colors of Granite & Quartz available at our showroom for your kitchen countertops . You are welcome to come in and choose the color that best suits you. Please bring rough sketch of countertop with the measurements & any small objects like a cabinet door/drawer, paint chips, flooring, tiles, or any other essential features of your room to help with your selection or a nice picture of your cabinet, floor and wall color which will help you to select the granite. Our sales staff will guide you pick the most suitable granite for your job & granite countertops cost


Template (Step 2)

recycled glass countertops

Once an order has been placed, a template will be scheduled for Templet person to visit the site and take exact measurements / hard template  for fabrication.       

We recommend for exotic slabs or slabs with veins and movements to come and lay the templet on the slab so you can ensure how each countertop will look on your kitchen before cutting .                      

Layout / Cutting (Step 3)

buy stone kitchen countertops

The template that was made by the templet person is then passed off to the production team to be laid out on the slab(s) for fabrication. A bridge saw using diamond-tipped blades precisely cuts the granite to the specifications of the template from simple cut to more complexed Waterfall design cuts all can be done with our machines .

Fabrication (Step 4)

granite tops

Once all cutting is complete, the countertops will move through production receiving sink cut-outs and metal rods for support, along with edge detailing and polishing. Once fabrication is complete, the countertops will be measured again to account for accuracy before being move to a crew for installation.

Installation (Step 5)

granite sinks

Drop-in and vessel sinks, cook-tops, outlets, and faucet/cord holes are all drilled on-site at the time of installation.                    Install time can vary significantly depending on the size and dynamics of the job. On average, vanity and bar tops can be completed in as little as 1 hour, with a standard kitchen install lasting 3-4 hours. If there is tear-out, on site cut-outs, or a more complex layout, installs can last longer than 4 hours. Seams are filled with an adhesive bonding agent and left to set, and they are color-matched to the stone in order to minimize their appearance. Dishwasher brackets will be used to secure them to cabinetry/stone. Under-mount sinks are secured using an epoxy and clamping method .

Final Walk through

Finally, the granite will be cleaned and sealed purchased Sealer before the installer leaves the site.  After finishing, the installer will do a walk through and answer any questions that you may have. Approving the installation paperwork confirms that you are satisfied with the work.

Get A free estimate in 24 hours

Take a picture & Send these 3 information Email / Text

Name -

Phone # - 

Job-site City -

email - estimate@kbfactoryoutlet.com

Text- (813) 344-3649

we make your dream kitchen affordable